Gas Injection Optimization to Increase Oil Production at MRA PT. PHE ONWJ
Abstract
The MRA platform is one of the offshore platforms located in the north of the Java Sea. The MRA platform has 4 production wells, namely MRA-2ST, MRA-4ST, MRA-5, and MRA-6 wells. The 4 production wells are produced using an artificial lift in the form of a gas lift. The limited gas lift at the MRA Platform at 3.1 MMSCFD makes the production of wells at the MRA Platform not optimal because the wells in the MRA Platform are experiencing insufficient gas lift. Optimization of gas lift injection is obtained by redistribution of gas lift injection for each. The results of the analysis in this study indicate that the optimum gas lift injection for the MRA-2ST well is 0.5552 MMSCFD, the MRA-6 well is 1.0445 MMSCFD, the MRA-5 well is 0.7657 MMSCFD, finally the MRA-4ST well with gas injection. lift is 0.7346 MMSCFD. The manual gas lift in the MRA-4ST is also replaced based on an economic feasibility analysis to ensure that the gas lift injection for each well can be kept constant. The redistribution of gas lift carried out by the author has increased the total production rate of the MRA Platform by 11,160 BO/year or approximately USD 781,200/year.
Keywords: Gas lift; Insufficient; Optimization
Full Text:
PDFReferences
Alarcón, G. A., Torres, C. F., & Gómez, L. E. 2002. Global Optimization of Gas Allocation to a Group of Wells in Artificial Lift Using Nonlinear Constrained Programming. Journal of Energy Resources Technology, 124(4), 262.
Buitrago, M., et al. 2016. Designing Construction Processes in Buildings by Heuristic Optimization. Engineering Structures, 111, 1-10.
Camponogara, E., & de Conto, A. M. 2005. Gas-Lift Allocation Under Precedence Constraints: Piecewise-Linear Formulation and K- Covers. In Proceedings of the 44th IEEE Conference on Decision and Control (pp. 4422–4427). IEEE.
Camponogara, E., & Nakashima, P. H. R. 2006. Solving a Gas-Lift Optimization Problem by Dynamic Programming. European Journal of Operational Research 174(2), 1220–1246.
Christensen, J., and Bastien, C. 2016. Nonlinear Optimization of Vehicle Safety Structures. Amsterdam. Elsevier.
de Souza, J. N. M. N. M., et al. 2010. Modeling, Simulation and Optimization of Continuous Gas Lift Systems for Deepwater Offshore Petroleum Production. Journal of Petroleum Science and Engineering, 72(3), 277-289.
Edwards, R., Marshall, D. L., & Wade, K. C. 1990. A Gas-Lift Optimization and Allocation Model for Manifolded Subsea Wells. In European Petroleum Conference. Society of Petroleum Engineers.
Eni P. Kanu, Joe Mach, Kermit E. Brown. 1982. Economic Approach to Oil Production and Gas Allocation in Continuous Gas Lift. J. Pet. Tech, February 1982, pp. 1886-1892.
Fletcher, R. 2013. Practical Methods of Optimization, Second Edition- Fletcher-Wiley Online Library. New York.Wiley.
Gomez, V. 1974. Optimization of Continuous Flow Gas Lift Systems. M. S. Thesis, U. of Tulsa.
Guo, B., Lyons, W. C., and Ghalambor, A. 2007. Petroleum Production Engineering A Computer-Assisted Approach. Gulf Professional Pub.
Guyaguler, B., & Byer, T. J. 2008. A New Rate-Allocation-Optimization Framework. SPE Production & Operations, 23(04), 448–457.
Iqbal, K. 2013. Fundamental Engineering Optimization Methods. ISBN 978- 87-403-0489-3. 1st edition.
Jacoud, A., et al. 2015. Modeling and Extremum Seeking Control of Gas Lifted Oil Wells. IFAC-PapersOnLine, 48(2012), 21–26.
James F Lea, Henry V Nickens. 1999. Selection of Artificial Lift. Paper SPE 52157 Presented at the SPE Mid-Continent Operations Symposiums. Oklahoma City. Oklahoma. March 28-31, 1999.
Kermit E Brown. 1984. The Technology of Artificial Lift Methods Volume 2a. The University of Tulsa.
Khamehchi, E., et al. 2009. Continuous Gas Lift Optimization with a Novel Genetic Algorithm. Australian Journal of Basic and Applied Sciences, I(4), 587-594.
Khamehchi, Ehsan., Mohammad Reza Mahdiani. 2017. Gas Allocation Optimization Methods in Artificial Gas Lift.
Khishvand, M., Khamehchi, E., & Nokandeh, N. R. 2015. A Nonlinear Programming Approach to Gas Lift Allocation
Optimization. Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, 37(5), 453–461.
Lima Silva, T., et al. 2015. Modeling of Flow Splitting for Production Optimization in Offshore Gas Lifted Oil Fileds: Simulation Validation and Applications. Journal of Petroleum Science and Engineering, 128, 86-97.
Lo, K. K. 1992. Optimum Lift-Gas Allocations Under Multiple Production Constraints.
Luenberger, D. G. 1984. Linear and Non-Linear Programming. New York. Addison-Wesley.
Mayhill, T. D. 1974. Simplified Method for Gas Lift Well Problem Identification and Diagnosis: Paper SPE 5151 Presented at the SPE 49th Annual Fall Meeting, Houston, TX, Oct 6-9, 1974.
Muchibbus, Farasdaq. 2019. Achieving Exceptional Efficiency of Gas Lift Design in Offshore North West Java Field Using Dynamic, Time-Based Equalised Method. Paper SPE 196534 MS Presented at the SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition held in Bali, Indonesia, Oct 29-31, 2019.
Nishikiori, N., et al. 1989. An Improved Method for Gas Lift Allocation Optimization. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.
Nguyen, Tan. 2020. Artificial Lift Methods: Design, Practices, and Applications. Springer.
Peter, Max S. and Klaus D. Timmerhaus, 2003, “Plant Design & Economic. for Chemical Engineers”, 5th Edition, Mc. Grow Hill Book Company: New York.
Rahma, Ulfia. 2013. Optimisasi Alokasi Gas Injeksi Pada Sistem Multiwell Gas Lift. Skripsi ITB.
Rao, S. S., and Rao, S. S. 2009. Engineering optimization: Theory and practice. John Wiley and Sons.
Ricky Aditiya Fandi et al. 2017. A Simple-Effective-Efficient. Analytical Model for Multiwell Gas Lift Allocation Optimization. IPA. Indonesian Petroleum Association. May. IPA17-468-E.
Simmons, W. E. 1972. Optimizing Continuous Flow Gas Lift Wells. Pet. Eng. Intl. (Aug 1972) 46-48 and (Sept 1972) 68-72.
Stanghelle, K. U. 2009. Evaluation of artificial lift methods on the Gyda field. Norway. University of Stavanger.
, API, 1994. Gas Lift Book 6 of The Vocational Training Series Third Edition. The API Exploration and Production Department.
, Mike-Mike F/S, 2021. Well Test Reading parameter. 01 – 30 Aug.
DOI: https://doi.org/10.31315/jpgt.v2i2.5519
This work is licensed under a Creative Commons Attribution 4.0 International License.