Integrated Production Optimization of Mature Field Y Under Network Constraints

Steven Chandra, Brian Tony, Rahma Widyastuti

Abstract


The Y Field, a mature field experiencing declining reservoir pressure, the production of hydrocarbons is declining, leading to the need for production optimization. One crucial aspect of this optimization is the selection of suitable artificial lift methods. The choice of artificial lift methods in Field Y is dependent on the unique reservoir conditions of each well. The commonly utilized equipment for artificial lift methods in Field Y includes the Sucker Rod Pump (SRP) and the Electrical Submersible Pump (ESP).

This bachelor thesis aims to develop an integrated production optimization strategy for maximizing well production in Structure X, a mature field. The study involves analyzing and optimizing artificial lift methods and integrating surface network simulation. The Inflow Performance Rate (IPR) curve is utilized to identify the production potential of each well in Structure X.

By evaluating the pump performance and surface network in Structure X, it is possible to identify wells that utilize artificial lift or existing pumps and have the potential to be improved up to their maximum operating range, based on their gross flow rate (BFPD). Through optimization, adjusting the stroke per minute for the Sucker Rod Pump (SRP) and the operating frequency for the Electrical Submersible Pump (ESP) can lead to a significant increase in production. Specifically, with a design production rate of 2308.59 BFPD, an improvement of 82.23 BOPD can be achieved.

Full Text:

PDF

References


Al Qahtani, A. (2013). A New Artificial Lifting of High Productivity Wells: A Production Optimization Scheme. Society of Petroleum Engineers.

Assavanives, B., Nitayaphan, S., Kokanutranont, C., Srisuma, P., Wanwilairat, S., Pechvijitra, P., . . . Thatan, N. (2023). Innovative Way of Improving S1 Production and Operation Using Real-Time Flowline Simulations of S1 Flowline Networks. International Petroleum Technology Conference, 1-8.

Beggs, H. (2003). Production optimization: using NODAL analysis. Tulsa, Okla: Petroskills Publications.

Byrd, J. (1968). High Volume Pumping with Sucker Rods. Journal of Petroleum Technology.

Di Tullio, M. T., & Marfella, F. (2018). Enhanced Sucker Rod Pumping Model: A Powerful Tool for Optimizing Production, Efficiency and Reliability. Society of Petroleum Engineers.

Guo, B., Liu, X., & Tan, X. (2017). Petroleum Production Engineering (Second Edition). Gulf Professional Publishing: Elsevier Inc.

Kalu-Ulu, T. C., Khamees, S. A., & Flippin, C. J. (2023). Sustainable Hydrocarbon Production Through ESP System Optimization in the Digital Era. International Petroleum Technology Conference.

Kennedy, D. M., & Ghareeb, M. (2017). Ultra-Long Stroke and Intelligent Rod Pumping System for Producing Difficult Wells and/or Fluids. Society of Petroleum Engineers.

Nickell, I., & Treiberg, T. (2022). Autonomous Control of Well Downtime to Optimize Production and Cycling in Sucker Rod Pump Artificially Lifted Wells. Society of Petroleum Engineers.

Production Operation Function. (2023). Workshop Pembuatan Potensi Field Jambi. Jambi: Pertamina Hulu Energi.

Stanko, M., & Golan, M. (2015). Exploring the potential of model-based optimization in oil production gathering networks with ESP-produced, high water cut wells. BHR Group 2015 Multiphase 17, 471-485.




DOI: https://doi.org/10.31315/jpgt.v4i2.10986

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.