Analysis of the Use of Sand Pump Control Pumps in Overcoming Sand Problem in Sucker Rod Pump (SRP) in Sp Wells In the Kawengan Field

Putri Sopacua

Abstract


The sand problem is a common challenge in the oil and gas industry. PT Pertamina EP Asset 4 Cepu Field in the Kawengan Field has rock which is a ngrayoung formation and the type of sandstone can cause sand to enter into the well bour when oil is produced for a long time. Therefore, we need the right tool to be able to overcome the problem of sandiness. In this case PT Pertamina EP Asset 4 Cepu Field in the Kawengan Field uses a sand control pump in an effort to overcome the sand problem. Thus, this research was conducted by analyzing the appropriate pump size from the sand rate calculation, fluid flow rate before and after using the sand control pump, as well as economic analysis. The results of the pump size analysis show that the right pump size to use is 2 joint mud anchors. The results of the subsequent analysis show an increase in the rate of fluid production after using a sand control pump. The results of the economic analysis show that the use of a sand control pump on a sucker rod pump (SRP) in the SP well is feasible because it has economic value with an oil price of 45 US$ / bbl, an NPV of 221,709 USD is obtained, and project success (IRR) reaches 106 %, as well as the value of pay out time for 1.83 years.

 

Keywords: Economy, Flow Rate, Sand Problem, Sand Control Pump, Sand Rate.


Full Text:

PDF

References


Ahmed, T. (2006). reservoir engineering handbook third edition. Burlington: Elsevier

Bergkvam R (2015) parametric sensitivity studies of gravel packing. (Master's theses).

Doust, H., & Sumner, H. S. (2007). petroleum systems in rift basins - a collective approach in southeast asian basins. Petroleum Geoscience, 13(2), 127–44.

Herawati, I., Novrianti, & Suyandi, A. (2015). evaluasi peningkatan produksi pada formasi sandstone sumur #h dan #p dengan perencanaan stimulasi pengasaman matriks (studi kasus lapangan falih). JEEE, 1-15

Hisham, F. B. (2015). a critical review on root cause analysis on gravel packing design and installation issues. Bandar Seri Iskandar: Universiti Teknologi Petronas.

Ikporo, B., & Sylvester, O. (2015). effect of sand invasion on oil well production: a case study of garon field in the niger delta. The International Journal Of Engineering And Science (IJES), 64-72

Isehunwa, S., & Farotade, A. (2010). sand failure mechanism and sanding parameters in niger delta oil reservoirs. International Journal of Engineering Science and Technology, 777-82

Jamil, N. F. (2011). production enhancement from sand control management. Perak: Universiti Teknologi Petronas

Mayokun, A. O. (2011). practical approach to effective sand prediction, control and management. Abuja, Nigeria: African University of science and Technology

Moehadi, M., 2010, fundamental of petroleum geology and explorations, Indonesia University

Roslan, M. R., Deris , M. N., Hafiz, M., Saebi, S., Afendy, M. N., & Munoz, I. (2010). Rigless through-tubing gravel pack for sand control in malaysia. World Oil .

Satyana, A.H., 2008, petroleum geology of indonesia, IAGI Professional Courses, Bali.

Sinaga, S.B.R. 2020. Bahan Ajar :Keekonomian Migas Edisi I. Tapanuli Tengah : Petroleum Engineering




DOI: https://doi.org/10.31315/jpgt.v5i1.11283

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Slot gacor maxwin

judi bola

slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor