[1]
Hesmatiar, E. et al. 2025. Re-Design of ESP Pump in EHS-155 Well in Tanjung Field Based on Problematic Scale and Economic Analysis. Journal of Petroleum and Geothermal Technology. 6, 2 (Nov. 2025), 18–30. DOI:https://doi.org/10.31315/jpgt.v6i2.16090.