[1]
riskadarto, sebastianus et al. 2023. Flow Assurance Improvement by Injecting Pour Point Depressant Chemical through Permanent Coiled Tubing Gas Lift to Heavy Oil at MM-1 Well at MPA Field. Journal of Petroleum and Geothermal Technology. 4, 1 (May 2023), 40–45. DOI:https://doi.org/10.31315/jpgt.v4i1.8717.