riskadarto, sebastianus, sulistyarso, harry budiharjo, & suhascaryo, nur. (2023). Flow Assurance Improvement by Injecting Pour Point Depressant Chemical through Permanent Coiled Tubing Gas Lift to Heavy Oil at MM-1 Well at MPA Field. Journal of Petroleum and Geothermal Technology, 4(1), 40–45. https://doi.org/10.31315/jpgt.v4i1.8717