RISKADARTO, Sebastianus; SULISTYARSO, Harry budiharjo; SUHASCARYO, Nur. Flow Assurance Improvement by Injecting Pour Point Depressant Chemical through Permanent Coiled Tubing Gas Lift to Heavy Oil at MM-1 Well at MPA Field. Journal of Petroleum and Geothermal Technology, [S. l.], v. 4, n. 1, p. 40–45, 2023. DOI: 10.31315/jpgt.v4i1.8717. Disponível em: https://jurnal.upnyk.ac.id/index.php/jest/article/view/8717. Acesso em: 5 dec. 2025.