riskadarto, sebastianus, et al. “Flow Assurance Improvement by Injecting Pour Point Depressant Chemical through Permanent Coiled Tubing Gas Lift to Heavy Oil at MM-1 Well at MPA Field”. Journal of Petroleum and Geothermal Technology, vol. 4, no. 1, May 2023, pp. 40-45, doi:10.31315/jpgt.v4i1.8717.