|
Issue |
Title |
|
Vol 1, No 1 (2023): Maret |
EVALUASI DESAIN CASING SUMUR EXISTING UNTUK REKOMENDASI SUMUR USULAN LAPANGAN “VILA” DENGAN MENGGUNAKAN METODE MAKSIMUM LOAD |
Abstract
PDF
|
Jumrianitha Vilastri, Allen Haryanto Lukmana, Pandu Bagas Amartya |
|
Vol 1, No 1 (2023): Maret |
EVALUASI KEGAGALAN PRIMARY CEMENTING PADA TRAYEK CASING LINER 7” DENGAN ANALISA CBL-VDL SUMUR “AK-12A” LAPANGAN “ADR” |
Abstract
PDF
|
Adriansyah Andra Kusuma, Avianto Kabul Pratiknyo, Damar Nandiwardhana, Risky Adhitya |
|
Vol 1, No 1 (2023): Maret |
PENERAPAN METODE CYCLIC WATERFLOODING UNTUK PENGEMBANGAN LAPANGAN MINYAK “AP” MENGGUNAKAN SIMULASI RESERVOIR |
Abstract
PDF
|
M Arif Perdana, Ratna Widyaningsih, Hariyadi Hariyadi |
|
Vol 1, No 1 (2023): Maret |
PERHITUNGAN ESTIMATE REMAINING RESERVE PADA RESERVOIR GAS WATER DRIVE DENGAN METODE MATERIAL BALANCE PADA LAPANGAN KW |
Abstract
PDF
|
Indah Widyaningsih, Boni Swadesi, Kartika Wibowo, Nuraisyah Ningsih |
|
Vol 1, No 1 (2023): Maret |
STUDI ANALISA PENGARUH FLUIDA PEREKAH DAN UKURAN PROPANT TERHADAP FOLD OF INCREASE PADA SUMUR RB-14 LAPANGAN “PSD” |
Abstract
PDF
|
Muhammad Iqbal Arrizqi Nuzli, Dyah Rini Ratnaningsih, Edgie Yuda Kaesti, Raden Banu Suryansyah |
|
1 - 5 of 5 Items |
|