Analisis Tingkat Efektivitas Kerja pada Mesin Auto Hanger dengan Menggunakan Metode Overall Equipment Effectiveness (OEE)

Melani Magdalena Hutabarat, Ahmad Muhsin

Abstract


The packing plant department 1 is still lacking in meeting production productivity targets. Therefore, the availability of raw materials and the condition of machinery and equipment is important to consider so that product productivity can be optimized. Three aspects affect the effectiveness of the machine in the packing department, namely productive time, work speed of the machine, and the quality of the product produced. The purpose of this study is to measure the effectiveness of the auto hanger engine by using the Overall Equipment Effectiveness (OEE) method to obtain the value of availability, performance efficiency, and rate of quality. The results obtained from OEE calculations are expected to be an evaluation of improvements in effectiveness that will be generated in the future. Based on the results of research that overall equipment effectiveness on the three machines has not reached world-class standards, which is> 85%. The availability value on the three machines also still does not meet the world-class standard, which is> 90%. The performance of rate values on the three machines also still does not meet world-class standards, which is> 95%. The availability value on the three machines also still does not meet the world-class standard, which is> 99%.


Keywords


OEE; Machinery; Department of Plant

References


Bangun, I. H., Rahman, A., & Darmawan, Z. (2014). Perencanaan Pemeliharaan Mesin Produksi Dengan Menggunakan Metode Reliability Centered Maintenance (Rcm) II Pada Mesin Blowing Om (Studi Kasus: PT Industri Sandang Nusantara Unit Patal Lawang). Jurnal Rekayasa dan Manajemen Sistem Industri, 2(5), p997-1008.

Iriani, Y., & Rahmadi, E. S. (2011). Usulan Waktu Perawatan Berdasarkan Keandalan Suku Cadang Kritis. 6th National Industrial Engineering Conference (NIEC-6), Universitas Widyatama, Surabaya.

Muhsin, A. (2016). Analisis Performansi Departemen Machinning Menggunakan Metode Overall Equipment Effectivenes (Oee)(Studi Kasus pada Perusahaan Pengecoran Logam Xyz). Opsi, 9(01), 16-23.

Ningrum, N. S., & Muhsin, A. (2016). Analisis Efisiensi dan Efektivitas Performansi Line Machining Propeller Shaft untuk Produk Flange Menggunakan Metode Overall Equipment Effectiveness (Oee). Opsi, 9(2), 109-118.

Rafian, M. A., & Muhsin, A. (2017). Analisis Beban Kerja Mekanik pada Departemen Plant dengan Metode Work Sampling (Studi Kasus pada PT Xyz). Opsi, 10(1), 35-42.

Ristyowati, T., Muhsin, A., & Nurani, P. P. (2017). Minimasi Waste Pada Aktivitas Proses Produksi Dengan Konsep Lean Manufacturing (Studi Kasus di PT. Sport Glove Indonesia). Opsi, 10(1), 85-96.

Wahyuni, M. F. Analisis Nilai Overall Equipment Effectiveness (Oee) sebagai Dasar untuk Perbaikan Efektivitas Kerja Mesin Cut Off di Plant X PT ABC. Jurnal Ilmiah Universitas Bakrie, 3(02).




DOI: https://doi.org/10.31315/opsi.v13i1.3468

Refbacks

  • There are currently no refbacks.




Sekretariat :
Jurusan Teknik Industri
FTI UPN "Veteran" Yogyakarta
d.a Jalan Babarsari 2 Tambakbayan Yogyakarta 55281
Telp. (0274) 486256
Website http://jurnal.upnyk.ac.id/index.php/opsi
email : jurnal.opsi@upnyk.ac.id

 

indexed by:

 
 
 


Lisensi Creative Commons
This work is Licensed Under a Creative Commons Attribution 4.0 International license.

View My Stats