PRODUCTION PERFORMANCE ANALYSIS OF MAKE-UP WELL X AND INTERFERENCE EFFECT IN GEOTHERMAL FIELD Y

Authors

  • Muhammad Romi Fardiansyah
  • Nanda Najih Habibil Afif
  • Welayaturromadhona
  • Agus Triono

DOI:

https://doi.org/10.31315/jpgt.v7i1.13913

Abstract

The problem currently occurring in the Y geothermal field is a decrease in production, especially at the geothermal power plant unit 4. The solution is to drill a make-up X well, The production test using orifice meter method is one way that can be used to determine the performance of a geothermal well, which will then produce a deliverability curve. When drilling a make-up X well, of course there is a water injection process into the well, this will cause an interference effect on the surrounding wells. The results obtained from the production test using orifice meter method on make-up X well, has an electrical potential of 9.49 Mw with a steam flow rate of 70.920 kg/kWh, and the type of production fluid is superheated steam. Whereas, the wells that were interfered with by make-up X well are production wells Well-B and Well-G, for production wells that are completely uninterrupted by make-up well are Well-E, Well-K, Well-H, Well-N, and Well-O. However, there are wells that experience instrument and data manipulation problems, so that the temporary conclusion is that they are not interfered with by make-up X well, including the production wells Well-C, Well-A, WellF, Well-D, Well-J, Well-L, Well-M, and Well-I.

Author Biography

Muhammad Romi Fardiansyah

Petorleum Engineering, Faculty of Engineering, University of Jember

References

Mawardi A, et al. 2010. Construction and Operation of Kamojang Unit 4, the First Commercial Geothermal Power Plant Built, Owned and Operated by PT Pertamina Geothermal Energy.Proceeding, World

Geothermal Congress.

Melysa R., Fitriani, 2017. nalysis of Potential Electrical Power at Geothermal Production Wells Using Back Pressure Method at Unit XY. Journal of earth Energy Engineering JEEE Vol. 6 No.1. ISSN:2540-9352.

Purwaningsih F. R., . Ruly. H., Waldy .A, Gugun., 2017: Make-up wells drilling cost in financial model for a geothermal project. Paper of IOP Conferences series: Earth and Environmental Sciens.

Saptadji, N. (2001): Geothermal Engineering, Bandung.

Sumintadireja P., S., Mizunaga H., & Ushijima K., 2000. Mise-A-LA- Mase And Gravity Data Surveys AtThe Kamojang Geothermal Field. Proceedings,World Geothermal Congress, Kyushu-Tohoku, Japan, May 28 - June 10, 2000.

Sutopo, Agni M, Ali Ashat, 2012. Permeability Distribution Characteristics of Reservoir Heat Geothermal Field X Based on InterferenceTest ModelUsing Tough2 Simulator. Proccedings, The 12th Annual Indonesia Geothermal Association Meeting & Conference, Bandung on November 6-8, 2012.

Downloads

Published

2026-05-30

How to Cite

Fardiansyah, M. R., Nanda Najih Habibil Afif, Welayaturromadhona, & Agus Triono. (2026). PRODUCTION PERFORMANCE ANALYSIS OF MAKE-UP WELL X AND INTERFERENCE EFFECT IN GEOTHERMAL FIELD Y. Journal of Petroleum and Geothermal Technology, 7(1), 62–71. https://doi.org/10.31315/jpgt.v7i1.13913

Issue

Section

Articles